The project involves detailed structural, geotechnical and alignment designs within the scope of the construction of 49 km of 2 x 2 lane road including underpasses and overpasses.
            
            
                
                
                    - Location  Tokat / TURKEY 
- Client Republic of Turkey General Directorate of Highways (KGM)
- Total Length of the Line  49 km, 2 x 2 Lane 
- Length of the Tunnel	 1,4 km - Cut & Cover
- Excavation 6.150.000 m³
- Fill10.700.000 m³ 
- Subbase	 496.335 tons
- Base Course643.529 tons
- Bituminous Base Course 302.328 tons 
- Binder		242.862 tons
- Wearing Course  153.038 tons
- Concrete  301.850 m³
- Regulating Works	49 km