Within the scope of the project; architectural, geotechnical, structural and landscaping design of two stations are carried out.
- Location Ankara-Sivas / TURKEY
- Client Turkish State Railways (TCDD)
- Total Length of the High Speed Railway Line 2x152 = 304 km
- Total Length of the Conventional Line2x9,5 = 19 km
- No. of Stations 2 (Kırıkkale and Elmadağ)
- Operations Control Center Ankara Operations Control Center
- Train Speed 300 km/h
- Subballast Supply & Laying 585.557 m3
- Ballast Supply & Laying 770.860 m3
- Track Work with Ballast (Single Line) 275.262 line-m
- Track Work without Ballast 56.116 line-m