The project involves structural, architectural and geotechnical detailed design of Artvin Hydroelectric Power Plant.
                the construction of an arch concrete gravity dam and hydroelectric power plant on Çoruh River with an installed power of 340 MW in two units and an annual power generation capacity of 1.026.000.000 kWh. The dam is 135 m high from stream bed and 180 m from the foundation.
            
            
                
                
                    - Location  Artvin (Çoruh River) / TURKEY 
- Client Doğuş Enerji Üretim ve Tic. A.Ş.
- Purpose Power Generation 
- Type	Arch Concrete Gravity
- Installed Capacity 2x170 MW = 340 MW
- Annual Power Generation 1.026.000.000 kWh 
- Reservoir Volume 167.000.000 m3
- Height	of the Dam180 m  
- Length of the Crest		278 m
- Type of Diversion Tunnel	 Horseshoe
- Diversion Tunnel Diameter 9,5 m
- Length of the Diversion Tunnel  747 m
- Type of the Access TunnelReverse U Type  
- Access Tunnel Diameter		823 m
- Relocation	 116 km